NUT SILO AND HEATER
- nut to FFB ratio - 12%
- drying time - 14 hour
- throughput - 4 mt/hr to 8 mt/hr
- efficiency - >95%
- separation velocity - 11 m/s to 13 m/s (remove 5% light particles)
- conveying velocity - 16 m/s to 18 m/s (prevent accumulation in ducting)
- cracked mixture to FFB ratio - 12% to 15%
- air to cracked mixture ration - 4 : 1
- air density at 27C - 1.1777 kg/m3
- bucket capacity - 85%
- motor efficiency - 75%
- chain speed - 0.3 m/s
- bucket spacing - 0.3 m
- elevator height - 15 m
- bulk density cracked mixture - 540 kg/m3
- gravity - 9.81 m/s
- conveyor velocity - 16 m/s
- separation velocity at 27C - 13 m/s
- cracked mixture to FFB - 12% to 15%
Source - Masrawana Mohd. Masran's Collection
1 comment:
nike zoom
adidas ultra boost
michael kors outlet
air max 2017
cheap jordans
air jordan shoes
louboutin shoes
led shoes
tory burch shoes
fitflops
Post a Comment